Customer Portal

Clover ETL Designer stuck in Synchronizing Projects

Comments 1

  • Avatar
    sshrestha
    0
    Comment actions Permalink
    I might have found a temporary fix for now. Turns out as soon as the designer opened, it was trying to connect to a server that was not available, which was returning 503 Internal Server Error. This caused the designer to get stuck in synchronization step.

    To fix this, I turned off the access to internet so that it failed to connect instead of getting 503 error. Then I converted the projects that were trying to connect to servers as local projects and reconnected to the internet.

    Now I can work in my designer just fine.

    Thank you,
    Shubha

Please sign in to leave a comment.