    The first and last (third) options are equivalent as to performance. Actually using multiple phases can be a bit faster as you don't need to restart JVM several times. Second option can produce results faster especially if your computer has more CPUs or single transformation does not consume all the resources.
    The other way of looking at this could be from the maintenance point - in the first case, you need to keep three (or more) separate files.
    Said that, it assumes that you don't need extra checking for dependance or timinig amongst those transformations.
  • Avatar
    oldforum
    0
    Comment actions Permalink
    Thanks for the feedback, David. I do have multiple processors available and I've tried to make each node failsafe so that an error on one record doesn't stop the whole process. I'm also using edges to pipe the data from node to node so there shouldn't be any timing or dependence issues. Yesterday, I ran a process with 8 nodes connected end-to-end and pushed 1,000,000 records through with no problems. The more I use CloverETL, the more impressed I am with the work you've done. Thanks.